Oil Production: 1.13M bpd ▲ +4% vs 2023 | Crude Exports: $31.4B ▲ 393M bbl (2024) | Proved Reserves: 2.6B bbl ▼ Declining | LNG Capacity: 5.2 mtpa ▲ Soyo Terminal | Refining Capacity: 150K bpd ▲ +Cabinda 30K | Hydro Capacity: 3.67 GW ▲ Lauca 2,070 MW | Electrification: 42.8% ▲ Target: 60% | Oil Revenue Share: ~75% ▼ of Govt Revenue | Upstream Pipeline: $60-70B ▲ 2025-2030 | OPEC Status: Exited ▼ Jan 2024 | Oil Production: 1.13M bpd ▲ +4% vs 2023 | Crude Exports: $31.4B ▲ 393M bbl (2024) | Proved Reserves: 2.6B bbl ▼ Declining | LNG Capacity: 5.2 mtpa ▲ Soyo Terminal | Refining Capacity: 150K bpd ▲ +Cabinda 30K | Hydro Capacity: 3.67 GW ▲ Lauca 2,070 MW | Electrification: 42.8% ▲ Target: 60% | Oil Revenue Share: ~75% ▼ of Govt Revenue | Upstream Pipeline: $60-70B ▲ 2025-2030 | OPEC Status: Exited ▼ Jan 2024 |

Remote Sites

Microgrid Solutions for Angola's Industrial and Remote Sites

Guide to microgrid design and installation for Angola's industrial operations, mining sites, and remote facilities requiring reliable power.

Feb 25, 2026
Layer 2 Intelligence

Access premium analysis for this section.

Subscribe →